A kitchen is a workflow wrapped inside joinery.
The strongest kitchens are not planned as cabinet elevations first. They begin with how the client cooks, stores food, moves through the space and uses appliances. Once that workflow is clear, cabinetry, services, lighting and materials can be coordinated around it.
Zones + movement
Storage, preparation, washing and cooking should connect naturally without creating traffic conflicts.
Exact models
Appliance dimensions, ventilation and service requirements directly control the joinery around them.
Power + water
Plumbing, extraction and electrical requirements should be coordinated before cabinetry is fabricated.
Junctions + finishes
Worktop edges, fillers, shadow gaps, handles, splashbacks and lighting determine whether the kitchen feels resolved.
Quick reference · common coordination points
| Element | Coordinate with | Common mistake |
|---|---|---|
| Island | Circulation, stools, pendants, power, sink/hob | Island sized for appearance but leaves poor aisles |
| Fridge | Housing, ventilation, hinge side, wall clearance | Door cannot open far enough to remove drawers |
| Oven stack | Cabinet height, ventilation, power, landing space | Appliances set too high or door clashes with circulation |
| Sink cabinet | Sink, trap, bins, filter, tap, dishwasher | Too many systems expected to fit inside one cabinet |
| Hob + hood | Extraction, clearances, power/gas, wall cabinets | Duct route considered after cabinetry is designed |
| Worktop | Slab size, seams, cut-outs, overhangs, support | Seam-free design exceeds available slab dimensions |
Design the island as a complete system.
Coordinate the cabinet modules, worktop slab, seating overhang, stool positions, pendant centreline, electrical supply and any sink or hob on the same drawing. If each is decided independently, the island quickly becomes a collection of small misalignments.
01 · Start with the kitchen brief
A good kitchen brief is about behaviour, not just style. Two clients with identical rooms can need completely different kitchens.
02 · Survey the existing conditions
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
03 · Plan the kitchen zones
The classic work triangle can be useful, but it is not a universal rule. Design around real zones, circulation and the number of users.
04 · Circulation + clearances
Clearances should be checked with doors and drawers open, not only when every cabinet is closed.
05 · Base cabinets + drawers
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
06 · Tall units + pantry
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
07 · Wall cabinets + open shelving
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
08 · Island + peninsula planning
An island should earn the space it occupies. If it damages circulation or creates unusable corners, a peninsula or clear floor may work better.
09 · Worktops
Confirm slab sizes early. A worktop concept that depends on an impossible seamless slab will need redesign later.
10 · Sinks + taps
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
11 · Hob + cooking zone
Cooking appliances bring heat, ventilation and electrical or gas requirements together. Coordinate them as one system.
12 · Ovens + specialist appliances
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
13 · Fridge + freezer planning
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
14 · Dishwasher + laundry appliances
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
15 · Extraction + ventilation
Extraction should be resolved before the ceiling and cabinetry are complete. A beautiful hood with nowhere sensible to duct is a common late-stage problem.
16 · Lighting
Kitchen task lighting should illuminate the worktop, not the top of the user's head.
17 · Electrical + power
Electrical requirements vary by jurisdiction. Use this guide for placement intent, then coordinate actual circuits and compliance with the qualified electrical professional.
18 · Splashbacks + wall finishes
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
19 · Materials + finishes
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
20 · Joinery details
Custom kitchens should be drawn in enough detail to price and fabricate, while construction, structural support and final fabrication remain coordinated with the specialist joiner / fabricator.
21 · Kitchen drawing package
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
22 · Specification checklist
Coordinate this part of the kitchen with the full drawing package and verify manufacturer-specific requirements before issue.
23 · Pre-issue QA
Before issue, review the plan, elevations, appliance schedule, joinery details, electrical plan and plumbing plan together. Kitchens fail when one of these gets updated without the others.