Bathrooms are small rooms with a lot of coordination.
The strongest bathroom designs resolve layout, plumbing, drainage, waterproofing, lighting, electrical points, finishes and joinery together. A change to one element often affects several others, so bathroom drawings should be developed as a coordinated package rather than as isolated plans and elevations.
Movement + privacy
Sanitaryware, circulation, door swings and sightlines need to work before finishes are selected.
Water + drainage
Fixture positions must be compatible with supply, waste, soil stacks and available floor build-up.
Waterproofing
Show where water is expected and coordinate substrates, falls, drains and penetrations.
Edges + junctions
Niches, mirrors, tile cuts, trims, glass, joinery and lighting determine whether the finished room feels resolved.
Quick reference · common coordination points
| Element | Coordinate with | Common mistake |
|---|---|---|
| Vanity | Basin, mixer, trap, drawers, mirror, lights, sockets | Drawers collide with waste / mirror and lighting are misaligned |
| Shower | Drain, falls, controls, glass, niche, tile layout | Drain and tile module are decided separately |
| WC | Cistern frame, wall build-up, flush plate, service access | Concealed frame depth is not allowed for |
| Bath | Filler, waste, access, structure, cleaning clearance | Freestanding bath is squeezed too close to walls to clean |
| Lighting | Mirror, vanity, wet zones, ceiling services | Only ceiling downlights are used for facial lighting |
| Tile | Wall dimensions, niches, sanitaryware, drain, trims | Set-out produces tiny cuts in the most visible locations |
Design it as one elevation.
Coordinate the mixer centreline, overhead shower, hand-shower rail, niche, glass edge and tile set-out on the same elevation. If each is located independently, the finished wall can feel misaligned even when every individual product is technically installed correctly.
01 · Start with the bathroom brief
Bathrooms are highly personal. Start with the client's routine, not a catalogue of fixtures.
02 · Survey the existing conditions
Coordinate this section with the rest of the bathroom package and verify product-specific requirements before issue.
03 · Plan the layout
A beautiful layout that cannot drain correctly is not a viable layout. Check services early.
04 · WC planning
Coordinate this section with the rest of the bathroom package and verify product-specific requirements before issue.
05 · Vanity + basin planning
The vanity is where the most daily interactions happen. Storage, lighting, sockets and mirror dimensions should be planned together.
06 · Shower planning
A shower works best when controls, drain, glass, niche and tile layout are designed as one system rather than separate decisions.
07 · Bath planning
Coordinate this section with the rest of the bathroom package and verify product-specific requirements before issue.
08 · Waterproofing + wet zones
Waterproofing is a construction system, not a finish. Decorative tile and grout should never be treated as the waterproofing strategy.
09 · Drainage + floor falls
Large-format tiles can make falls harder to achieve around point drains. Coordinate tile size and drainage geometry together.
10 · Tile + stone planning
Tile set-out should be intentional. Review the most visible elevations before deciding where cuts begin.
11 · Niches + ledges
Coordinate this section with the rest of the bathroom package and verify product-specific requirements before issue.
12 · Mirrors + lighting
Mirror lighting is primarily about faces, not ceilings. Overhead light alone often creates harsh shadows.
13 · Electrical + sockets
Electrical rules in bathrooms vary by jurisdiction. Use the relevant local code and qualified electrical professional rather than copying generic wet-zone diagrams.
14 · Ventilation + humidity
Good ventilation protects finishes, joinery, mirrors and indoor air quality. It should be resolved during design, not after condensation appears.
15 · Heating + comfort
Coordinate this section with the rest of the bathroom package and verify product-specific requirements before issue.
16 · Storage + joinery
Coordinate this section with the rest of the bathroom package and verify product-specific requirements before issue.
17 · Accessibility + safety
Accessible design requirements can be highly specific. Where accessibility is part of the brief, verify the applicable local standard before issue.
18 · Drawing package checklist
Coordinate this section with the rest of the bathroom package and verify product-specific requirements before issue.
19 · Specification checklist
Coordinate this section with the rest of the bathroom package and verify product-specific requirements before issue.
20 · Pre-issue QA
Before issue, review the bathroom in plan, elevation and section at the same time. Most mistakes are coordination mistakes between these drawings.